×

INDI Library v2.0.7 is Released (01 Apr 2024)

Bi-monthly release with minor bug fixes and improvements

Ekos capturing plan

  • Posts: 334
  • Thank you received: 23
Since when I use Ekos and exposure plans with filters, i see that if I configure 10exposures for each filter, Ekos captures 10 subs of each filter before change to the next filter.
Is it possible have a "vertical plan" that execute the exposures for each filter from top to down and then restaart the sequence???
3 years 9 months ago #56439

Please Log in or Create an account to join the conversation.

  • Posts: 163
  • Thank you received: 26

Replied by Bart on topic Ekos capturing plan

Hi Porky,

This currently can't be done from the sequence.
What is a good solution is to generate a sequence (for example R, G, B or an U, B, V, R, I) and run this in the scheduler consecutively with an end-time, a number of runs or as I use it, the twilight as terminator.

An advantage (that I could come up with) of this would be that you can generate wacky sequences such as RRR, GGG, BBB or a weird combination of it like RRR, GG, BBBB.

I found it awkward to work with the sequencer at first, but now I almost exclusively with it.

Good luck!
3 years 9 months ago #56445

Please Log in or Create an account to join the conversation.

Time to create page: 0.506 seconds