Since when I use Ekos and exposure plans with filters, i see that if I configure 10exposures for each filter, Ekos captures 10 subs of each filter before change to the next filter.
Is it possible have a "vertical plan" that execute the exposures for each filter from top to down and then restaart the sequence???
This currently can't be done from the sequence.
What is a good solution is to generate a sequence (for example R, G, B or an U, B, V, R, I) and run this in the scheduler consecutively with an end-time, a number of runs or as I use it, the twilight as terminator.
An advantage (that I could come up with) of this would be that you can generate wacky sequences such as RRR, GGG, BBB or a weird combination of it like RRR, GG, BBBB.
I found it awkward to work with the sequencer at first, but now I almost exclusively with it.