Mark Sandford replied to the topic 'Scheduler Start/Stop Times' in the forum. 3 years ago

wvreeven post=70044 wrote: Ekos does have this. For each job in the scheduler you can specify a specific start time:
 


And the number of images taken in the job determines the length of the job. It may not be as flexible as you want but it certainly is doable.
 

Thanks, I’ve used the start time feature, but using the “number of subs” method is not always useful. Sometimes autofocus runs more frequently, guiding pauses sometimes, or other delays, and that means the job can run well over the plan. 

I really just want an altitude limit which moves in to the next job in line, that would suit me perfectly. SGP, NINA and  APT all do that with no issues. 

Read More...