×

INDI Library v2.0.7 is Released (01 Apr 2024)

Bi-monthly release with minor bug fixes and improvements

How to repeat jobs created by mosaic planner ?

  • Posts: 163
  • Thank you received: 26
And for good measure the content of the scheduler (.esl) file:

Warning: Spoiler!
Last edit: 7 months 3 weeks ago by Bart.
7 months 3 weeks ago #95539

Please Log in or Create an account to join the conversation.

  • Posts: 167
  • Thank you received: 23
@Bart,

Did you open/move/edit one or more FITS files during the running sequence ?

I've been struggling with the same problems as you since posting this topic some weeks ago and I'm starting to suspect that as soon as the timestamp or other file properties of the FITS file changes, the process starts acting weird.

Unfortunately we haven't had a clear night here yet to try again.
7 months 3 weeks ago #95544

Please Log in or Create an account to join the conversation.

  • Posts: 163
  • Thank you received: 26
I first imaged M31 for a few lights, just for the heck of it (and waiting for full darkness).
Then opened the schedule, ran that, checking if focus, align and guidibg went well. It did, so I went home and left it running.
Didn't explicitly open one of the fits.
Last edit: 7 months 3 weeks ago by Bart.
7 months 3 weeks ago #95547

Please Log in or Create an account to join the conversation.

  • Posts: 167
  • Thank you received: 23
Please can anyone from the developers indicate whether opening FITS files has an impact on the numbering or more specifically on the strange numbers when creating a mosaic?
7 months 3 weeks ago #95572

Please Log in or Create an account to join the conversation.

  • Posts: 167
  • Thank you received: 23
Quote Hy:

1- Set each of the 4 mosaic tile scheduler jobs to have the same non-empty group name, and set each of them to have the "Repeat until terminated" completion condition. Of course, to set that you need to double click on a job (the + above the table turns into a checkbox), make sure those two items are set properly, then click the checkbox above the scheduler queue table. It's a good idea to then save that schedule to disk so you can re-load it the next time.

Why should one double click every job? If the "Repeat until terminated" option is selected and the group name has been given in the mosaic planner, the created jobs looks fine.

What is the advantage to double click every job to have the "+" changed in a "v"?
7 months 3 weeks ago #95661

Please Log in or Create an account to join the conversation.

  • Posts: 163
  • Thank you received: 26
Essentially he wants us to make sure that each job in that schedule has 'repeat until terminated' checked.

(And yes, of course they are)

My hunch is that it has to do with some condition where the 'imager' tab wants to keep going to finish the x images in the sequencer, and at the same time, the scheduler (greedy?) wants to stop that job in order to keep the number of images of the (four) jobs roughly equally fast growing.
It happened before only with the first job, the subsequent jobs go on very well. That's likely because the 'number of required images' is equal to the number of images in those subsequent sequences. Except for the first one to start for that evening.

Cheers!
Last edit: 7 months 3 weeks ago by Bart.
7 months 3 weeks ago #95662

Please Log in or Create an account to join the conversation.

  • Posts: 167
  • Thank you received: 23
I just started a 2 x 2 mosaic of the Pelican Nebula
Each time 15 shots of 60 seconds, completely according to the instructions.



Fingers crossed !
7 months 3 weeks ago #95663
Attachments:

Please Log in or Create an account to join the conversation.

  • Posts: 167
  • Thank you received: 23
Only one night and some quick processing, so there is still work to be done.
But conceptually the mosaic and stitching was successful...

7 months 2 weeks ago #95701
Attachments:

Please Log in or Create an account to join the conversation.

  • Posts: 163
  • Thank you received: 26
That looks good!

Now I wonder if another night proceeding with this schedule / job group it would also 'just keep going'.

For me, the issue occured recently again, twice in a night.
I have the logs, but would any dev still like to help out please? :)
7 months 2 weeks ago #95722

Please Log in or Create an account to join the conversation.

  • Posts: 1224
  • Thank you received: 566
If you have 'Repeat until terminated' checked for all your tile jobs then the same schedule should continue to collect images for all tiles.

If you have verbose logs to share, please post links to them along with your description of what problem you're reporting in as much detail as possible. I've alerted Wolfgang who is more familiar with what I think you're describing.

Hy
7 months 2 weeks ago #95730

Please Log in or Create an account to join the conversation.

  • Posts: 167
  • Thank you received: 23
Second night running with exactly the same 4 jobs, repeat until terminated enabled for all 4 jobs.

Yesterday there was no issue, but I purposely didn't "touch" any of the files during capture. I still suspect that as soon as the timestamp or other file properties of the saved FITS file changes, the process starts acting weird.

Please can someone from the developers explain what file check is happening before/after saving of each FITS file?
7 months 2 weeks ago #95735

Please Log in or Create an account to join the conversation.

  • Posts: 1224
  • Thank you received: 566
The code simply checks to see if there are files with the right file names in the right directory on disk and counts them. It does not look in detail at those files, just checks the file names
7 months 2 weeks ago #95738

Please Log in or Create an account to join the conversation.

Time to create page: 0.543 seconds